PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing conduit at the bridge by the Administration Building (800x600).jpg Installing shear wall panels at Elev. 1,2,3 (4th Floor) Facing West (800x600).jpg Underground piping for the Tele-Data at the Administration Bldg. parking Pic -1 (800x600).jpg Underground piping for the Tele-Data at the Administration Bldg. parking Pic -2 (800x600).jpg Building rebar mats for Stair -4 (4th Floor) Facing South (800x600).jpg Building the Elev. 1,2,3 Door Frames Facing West  (800x600).jpg Installing shear wall panels at Elev. 1,2,3 (4th Floor) Facing South (800x600).jpg Installing the underground piping at Men's Room 133 Facing North (800x600).jpg Installing the underground piping at the Locker Room 133 Facing North (800x600).jpg
Previous pageNext page Building rebar mats for Stair -4 (4th Floor) Facing South (800x600)
Building rebar mats for Stair -4 (4th Floor) Facing South (800x600)